Most Australian construction contracts cap retention, the percentage of a progress payment held back as security against defective or incomplete work, at 5% of the total contract value before practical completion, the ceiling Queensland’s QBCC Act sets in law and the rest of the industry mirrors as standard practice in 2026. That money does not disappear from the invoice; it is deducted as its own line, and in several states it now has to sit in a dedicated trust account rather than the head contractor’s own bank account. Here is how retention actually works on an Australian construction invoice: how the deduction is calculated and shown, when the defects liability period ends and the money comes back, and which states require it be held in trust.

How much retention gets withheld from an Australian construction invoice?

Typically 5% of the total contract value, capped by Queensland’s QBCC Act and echoed as standard practice across the rest of the country. Retention is money a head contractor withholds from what it otherwise owes a subcontractor, or a principal withholds from a head contractor, held as security rather than paid out with the rest of a statutory progress payment claim.

The Queensland Building and Construction Commission Act sets three separate limits for trade contracts rather than one flat number: the running total a builder can hold before practical completion can never exceed 5% of the contract price, no single progress payment can have more than 10% deducted from it, and once practical completion is reached the maximum retention still held drops to 2.5% of the contract price, according to a Housing Industry Association summary of the Act. Contracts in other states rarely carry an identical statutory formula, but land in the same broad range: Procore’s construction guide puts standard retention at 5% to 10% of each progress payment, capped at roughly 5% of the total contract value overall, the same ceiling Queensland’s legislation happens to set as law.

Queensland trade contract retention caps under the QBCC Act 0%3%6%9%12%5%Total before completion10%Any single progress payment2.5%Total after completion

Figure 1: Retention caps for Queensland trade contracts under the QBCC Act. Source: Queensland Building and Construction Commission Act 1991, via HIA.

None of these limits are automatic protections a subcontractor gets by default; they only apply once a contract is actually written to reference them, or where legislation makes them mandatory regardless of what the contract says, as Queensland’s caps do for trade contracts. Reading the retention clause before signing, not after the first progress claim comes back short, is the only way to know which of these limits actually governs a given job.

How does retention actually appear on a progress invoice?

As a line-item deduction from the claim, not as a separate later bill. A typical progress invoice or payment claim shows the full value of work claimed for that period, deducts the retention percentage as its own line, and states the net amount actually payable, the figure the client is expected to pay now. A $100,000 progress claim with 5% retention withheld, for example, shows $95,000 as the amount due, with the remaining $5,000 recorded as retention held rather than paid, according to EEA Advisory’s guide to Australian retention accounting.

GST does not follow the same timing as the deduction itself. The ATO’s dedicated determination on the topic, the Goods and Services Tax: (Particular Attribution Rules for Retention Payments) Determination 2017, defers attribution of the GST payable, and the matching input tax credit, on the retained portion of a progress claim until the retention amount is actually paid out, not when the invoice is issued. The tax invoice itself still has to show the full price of what was supplied, including the retained amount, with the retention separately identified and the net amount payable stated clearly, so a subcontractor’s GST reporting on that invoice needs to track which slice of each claim is still outstanding retention rather than settled revenue.

How a retention deduction splits a progress claim, 5% vs the 10% per-payment cap 0%30%60%90%120%Net payableRetention withheld5% retention (running total cap)10% retention (per-payment cap)

Figure 2: How a retention deduction changes the net payable amount on a progress claim, at the 5% running cap versus the 10% per-payment cap. Source: Queensland Building and Construction Commission Act 1991, via HIA; EEA Advisory.

A payable link attached to a properly itemized invoice makes that net-payable figure unambiguous to a client from the moment the claim goes out, retention line and all, rather than leaving the deduction to be argued over after the fact.

When does retention actually get released, and what is the defects liability period?

Not until the defects liability period ends, and usually not all at once even then. The defects liability period, sometimes called the maintenance period, is the window after a project reaches practical completion during which the contractor remains responsible for fixing defects at its own cost, rather than the client having to chase a separate warranty claim. In Australia it most commonly runs 12 months from practical completion under major standard-form commercial contracts such as AS 4000 and AS 2124, though the range used across the industry stretches from 6 to 24 months depending on the contract form and the type of work, according to a Visibuild guide to the period.

Most common defects liability period length in Australian construction contracts 12 months024 monthsIndustry range runs 6 to 24 months (Visibuild)

Figure 3: The most common defects liability period length used in Australian construction contracts. Source: Visibuild.

The period matters to invoicing specifically because it is usually the trigger written into the retention release clause, not a fixed calendar date agreed separately. Once it ends and any defects notified during it have been rectified to the principal’s or head contractor’s satisfaction, the party holding the money is contractually obliged to release what remains, though disputes over whether every defect was actually fixed are a common reason final retention release still runs late in practice, on top of a construction sector where Australian invoices already settle an average of 6.9 days past due, according to Xero Small Business Insights. A subcontractor chasing that final release once the period lapses is really chasing an already-earned progress payment that has simply been sitting on someone else’s balance sheet for months in the meantime; a structured reminder sent right as the period ends, rather than an ad hoc phone call weeks later, is often the difference between a prompt release and a retention balance that quietly slips another billing cycle.

Most contracts do not wait until that end date to release any of it. A common structure, illustrated in EEA Advisory’s Queensland worked example, releases half the retention held once practical completion is certified and the works are fit for use, and holds the remaining half until the defects liability period itself has run its course, subject to the contract terms and unless a dispute over defects intervenes. Western Australia’s own guidance instead defers to whatever release dates the contract itself sets out, underlining that this two-stage split is common market practice rather than a uniform national rule.

How a Queensland retention balance is typically released 50%50%Released at practical completion50%Held to end of defects liability period50%50/50typical split

Figure 4: The common two-stage release pattern for a construction retention balance. Source: EEA Advisory.

Does retention have to sit in a trust account? NSW’s rules

Increasingly, yes, though which contracts are covered still varies significantly by state. New South Wales requires head contractors to hold retention money in a dedicated trust account, opened with an authorized deposit-taking institution, once a head contract’s value reaches $20 million, under section 12A of the Building and Construction Industry Security of Payment Act 1999. The head contractor has to notify the account-holding institution in writing that the account is a retention trust account, and separately notify the NSW Secretary of the account and institution details within 14 days of opening it. Failing to comply carries fines of up to $22,000, according to the NSW Government’s own guidance on the scheme.

That $20 million threshold will not stay where it is. A 2026 proposal from the NSW Government would cut it to $10 million, roughly halving the size of head contract that triggers the trust requirement and pulling a meaningfully larger slice of the state’s construction sector into the scheme, according to Norton Rose Fulbright’s coverage of the proposed change.

NSW's retention trust account threshold, current vs 2026 reform proposal NSW head contract value20Mbar = actual, tick = target

Figure 5: NSW’s retention trust account threshold, current versus the 2026 reform proposal. Source: NSW Government; Norton Rose Fulbright.

For any subcontractor working under a head contract that size, whether retention sits in a ring-fenced trust account or the head contractor’s own operating account is not a technicality: it is the difference between money that survives a head contractor’s insolvency and money that becomes just another unsecured claim in the wind-up, the same insolvency risk this site’s Australian construction late-payment report covers in more detail.

How do Queensland and Western Australia compare on retention trust accounts?

Both go further than NSW, in different ways. Queensland runs a two-part framework under the Building Industry Fairness (Security of Payment) Act 2017: a project trust account for the head contract itself, and a linked retention trust account specifically for any cash retention withheld from subcontractors under that project. The regime currently applies to Queensland Government and Hospital and Health Service contracts worth $1 million or more, and to private sector, local government, and statutory authority contracts worth $10 million or more, thresholds in place since 1 January 2022, according to the Queensland Building and Construction Commission. A further rollout to lower private-sector thresholds was paused by the Queensland Government in February 2025 pending review, so the $10 million private-sector line has not moved since.

Western Australia has gone the furthest of any state. Its retention trust scheme started in February 2023 covering only contracts worth $1 million or more, then dropped that threshold twice over the following year, reaching just $20,000 for non-residential, non-government contracts from 1 February 2024, according to Grant Thornton’s summary of the reform’s third phase. At that level, almost every commercial trade contract in the state, not just large head contracts, now falls under the trust requirement.

Contract value that triggers a retention trust account, by state $20M NSW head contracts $10M Queensland private $20K WA non-residential

Figure 6: Contract value above which retention must sit in a trust account: NSW $20 million, Queensland $10 million (private sector), WA $20,000 (non-residential, non-government). Source: NSW Government; QBCC; Grant Thornton.

Retention trust account thresholds, state by state

StateTrust account required aboveRetention percentage limitsSource
New South Wales$20 million (proposed $10 million in 2026)No statutory cap; industry practice around 5%NSW Government; Norton Rose Fulbright
Queensland$10 million (private); $1 million (government)5% before completion; 10% per payment; 2.5% after completionQBCC; HIA
Western Australia$20,000 (non-residential, non-government)Set by contract; no statutory percentage capGrant Thornton

Table 1: Contract-value thresholds and retention percentage rules across the three states covered in this report.

The Bottom Line

Retention is not a fee or a penalty, it is a subcontractor’s own money, earned and claimed, just not paid out yet. The 5% figure that anchors most Australian construction contracts is a ceiling most parties actually use, not a legal maximum every job is entitled to, and the real protection for a subcontractor increasingly sits in whether that money has to be held in trust at all: a ring-fenced pool under NSW’s $20 million threshold or Queensland’s $10 million private-sector line, or WA’s $20,000 line that now catches almost every commercial job in the state. None of that changes the paperwork underneath it: a subcontractor still has to show, on every invoice, exactly what was claimed, what was withheld as retention, and what is actually payable now. BillyPaid’s invoice generator itemizes that split cleanly on every progress claim, so the retention line is never the reason a payment gets disputed or delayed. For the statutory document retention is actually deducted from, see this site’s full breakdown of progress payment claims under the various state Security of Payment Acts.

Frequently Asked Questions

How much retention can be withheld from an Australian construction progress payment?

Industry practice generally withholds 5% to 10% of each progress payment, but Queensland’s QBCC Act sets the clearest statutory formula: a running total capped at 5% of the contract price before practical completion, up to 10% deductible from any single progress payment, and a maximum of 2.5% of the contract price once practical completion is reached.

How does retention appear on a construction progress invoice?

As a separate deduction line rather than a later bill. The invoice states the full value of work claimed, deducts the retention percentage, and shows the net amount actually payable now, while the full claimed amount, including the retained slice, is still what appears on the tax invoice for GST purposes, since the ATO’s PAR 2017/2 determination defers GST attribution on the retained portion until it is actually paid, not when the invoice is issued.

When is retention money released on an Australian construction project?

Typically in two stages: half at practical completion once the works are fit for use, and the remaining half once the defects liability period ends and any notified defects have been rectified, according to EEA Advisory’s Queensland worked example. That defects liability period most commonly runs 12 months from practical completion, though contracts range from 6 to 24 months.

Does retention money have to be held in a trust account in Australia?

In some states, yes. New South Wales requires a trust account on head contracts worth $20 million or more, with a 2026 proposal to lower that to $10 million. Queensland requires one on government contracts worth $1 million or more and private-sector contracts worth $10 million or more. Western Australia has gone furthest, covering non-residential contracts worth more than just $20,000 since February 2024.

Sources and References

  1. Housing Industry Association: Retention limits for trade contracts, Queensland, summarizing the QBCC Act’s 5%, 10%, and 2.5% caps.
  2. Procore: Understanding Retention in Construction Contracts, Australia’s Rules and Best Practices.
  3. EEA Advisory: Retention Money in Australian Construction Contracts, Complete 2025 Guide, the accounting and release-schedule worked example.
  4. Australian Taxation Office: Goods and Services Tax (Particular Attribution Rules for Retention Payments) Determination 2017 (PAR 2017/2).
  5. Visibuild: What Is a Defects Liability Period in Construction?
  6. NSW Government: Retention money held by head contractors.
  7. Norton Rose Fulbright: NSW Government proposes to reduce retention trust account threshold to $10 million.
  8. Queensland Building and Construction Commission: Trust account rollout, the $1 million and $10 million thresholds effective 1 January 2022.
  9. HWL Ebsworth: Press Pause, Queensland Project Trust Accounts, the February 2025 rollout pause.
  10. Grant Thornton Australia: WA Security Reforms, Phase 3 effective from February 1, 2024, the $20,000 threshold.

Note: All figures verified as of November 2026.